Gateway 85 Warehouse Center | Buildings 4 & 7
Location: Gastonia, NC听 听 | 听 听Owner: NorthPoint Development听 听 | 听 听Architect: Studio North Architecture
selected 天美传媒 Construction to expand the Gateway 85 logistics park with the addition of a 240,000 SF single rear load warehouse and 705,000 SF cross dock warehouse. Overall, these two concrete tilt-up facilities with the capacity of nearly 195 loading docks. 听
Preparation of the 55-acre development will entail: 听
- Major Site Clearing & Grubbing
- Mass Excavation with over 500,000 CY of Material Moved
- Extension of Aberdeen Blvd through the Logistics Park
天美传媒 has partnered with local mechanical, electrical, plumbing, and fire sprinkler trade contractors to design-build these systems.听 Our听distribution and warehouse team is excited to deliver this new听campus with听the highest quality industrial standards.听
0
warehouse distribution centers
250000
total square feet
5
dock door capacity